Glasgow Airport Ltd v Messrs. Kirkman and Bradford

Issue 87 - September 2007

Were the costs recoverable under the collateral warranty Ltd to the costs of repair, renewal and/or reinstatement of any part or the works? Did liability extend to consequential losses?

PDF logoClick to download PDF [1]

Wittmann (UK) Ltd v Willdav Engineers S.A.

Issue 87 - September 2007

Was Wittman entitled to recover amounts outstanding under a parent company guarantee?

PDF logoClick to download PDF [1]

Mirant Asia-Pacific Construction (Hong Kong) Ltd v Ove Arup Partners International Ltd

Issue 84 - June 2007

Judge Toulmin CMG QC sets out some useful guidance for the use of critical path analysis on construction projects.

PDF logoClick to download PDF [2]

Multiplex Constructions (UK) Ltd v Honeywell Control Systems Ltd

Issue 83 - May 2007

Was time at large and why are time bars so important?

PDF logoClick to download PDF [3]

Skanska Rasleigh Weatherfoil v Somerfield Stores Ltd

Issue 80 - February 2007

What was the correct approach to the interpretation of contracts?

PDF logoClick to download PDF [4]

  • Load more [5]

Links
[1] https://www.fenwickelliott.com/sites/default/files/docs/dispatch/Dispatch_issue_87.pdf [2] https://www.fenwickelliott.com/sites/default/files/docs/dispatch/Dispatch_issue_84.pdf [3] https://www.fenwickelliott.com/sites/default/files/docs/dispatch/Dispatch_issue_83.pdf [4] https://www.fenwickelliott.com/sites/default/files/docs/dispatch/Dispatch_issue_80.pdf [5] https://www.fenwickelliott.com/print/research-insight/newsletters/dispatch/contract-issues?page=36